|
||
| Home Contact Us |
![]() |
This project consisted of two, three-story apartment buildings, connected by a Commons Area. This project include the renovation of all Commons Areas. This project was in multiple phases while working around the residence of the apartment complex. The electrical renovations consisted of new corridor lighting, including ceiling and resident door lighting. The two, three-story atriums were completely re-lighted with new fixtures. New offices, pharmacy and bank were also part of these renovations, along with a new serving area and three new dining areas. PAC Parking Lot Client: Shippensburg University Project: New Parking Lot Lighting Location: Shippensburg, PA Completion: August, 2004 This project consisted of lighting for a new parking lot adjacent to the Performing Arts Center. This project was unique from an electrical perspective in that it was our responsibility to install an 11-foot deep, 30 inch diameter spread footer base for each of the 40 foot lighting standards. To maximize project time and safety of forming such a base, these bases were pre-cast and shipped to the site complete. The installation of these 11 poles, bases and distribution was installed in approximately four weeks. Book Store Client: Harrisburg Area Community College Project: Book Store Addition Location: Harrisburg, PA Completion: August, 2003 The existing bookstore on campus needed to roughly double its size to accommodate the storage of media for the bookstore. The entire existing bookstore was converted to a showroom area and new storage and office areas were added. The electrical construction included a duct bank to an adjacent building, power distribution center for future upgrades. New high bay lighting, HVAC power and fire alarm systems were installed in the new addition for the storage and offices. New Parking Areas Owner: Homeland Center General Contractor: R. S. Mowery Project: Parking Lot Lighting Location: Harrisburg, PA Completion: January, 2005 This project consisted of removing some existing parking lot lighting, relocating to new and enlarged parking lot areas. New lighting standards with all new wiring and two new electrical services to supply the two new parking areas was also included in this contract.
This was CV Services’ first construction contract. It was a new four-bay storage facility for the school district. Electrical construction included a new underground duct bank from the existing building for future expansion, lighting, and general power.
|
|||||||||||||||||||