New Furniture Showroom
Client: Gehman & Company
Project: Complete Electrical, Building Renovation
Location: Mechanicsburg, PA
Completion: 2004
|
 Click here for more photos. |
This project involved the demolition and removal of all existing electrical equipment in an existing 32,000 square foot supermarket.
The electrical conversion of the building involved the installation of over 700 feet of track lighting and 2X4 parabolic lights for the individual show areas. The electrical connection of eight new air conditioning units on the roof was also included in this contract.
|
Retail Center
Client: Artworks
Project: 10,000 square foot retail center
Location: Mechanicsburg, PA
Completion: 2004
|
 Click here for more photos. |
This 10,000 sq.ft. retail center is the headquarters of Artworks, along with two other retail strip stores. This project included multi-tenant metering for all three stores.
The lighting in the anchor store included several hundred feet of track lighting along with 2X4 parabolic lighting. The installation also included the storage and shop operations for their framing shop.
|
(2) AutoZone Retail Stores
Owner: AutoZone Retail Store
General Contractor: R. S. Mowery
Project: Auto Parts Retail Store
Location: Mechanicsburg, PA Sinking Spring, PA
Completion: 2005, 2006
|
 Click here for more photos. |
This installation was a new building for a retail automobile parts store. The installation included specific layouts of hanging strip fixtures for inventory aisles and general mechanical equipment connections, power distribution and site pole lighting.
|